July 22, 2026
11 11 11 AM
NIGERIA, CHINA DEEPEN DEFENCE TIES, PUSH LOCAL MILITARY PRODUCTION
TINUBU COMMENDS SECURITY AGENCIES OVER RESCUE OF ABDUCTED OYO PUPILS, TEACHERS
ICPC ARRESTS EL-RUFAI’S DOCTOR OVER ALLEGED COURT ORDER VIOLATION
KWARA REAFFIRMS FREE COMMON ENTRANCE EXAM, WARNS AGAINST ILLEGAL FEES
AGBESE SEEKS SUSPENSION OF PROPOSED NYSC REFORMS
15 DIE IN LONE TRAILER CRASH IN KWARA
KANO POLICE IMPOUND 81 VEHICLES OVER COVERED NUMBER PLATES
PRP PRESIDENTIAL ASPIRANT URGES FG TO PROTECT NIGERIANS ABROAD
US TO MONITOR NIGERIA’S 2027 ELECTIONS, CONGRESSMAN SAYS
SECURITY FORCES RECOVER 1,000 STOLEN LIVESTOCK, DEAL MAJOR BLOW TO BANDITS IN KOGI

MINISTER OF STATE PETROLEUM RESOURCES (Oil) SAYS THE FPSO FACILITY IN LAGOS WILL TRANSFORM NIGERIA’S OIL SECTOR

Share

 

MINISTER OF STATE PETROLEUM RESOURCES (Oil) SAYS THE FPSO FACILITY IN LAGOS WILL TRANSFORM NIGERIA’S OIL SECTOR                                                                                     11-10-24

By Sadiq Aminu                                                                The Minister of State Petroleum Resources (Oil). Senator Heineken Lokpobiri says the groundbreaking Floating Production Storage and Offloading ( FPSO) facility in Lagos is set to transform Nigeria’s Oil Sector for more efficiency.

The Minister made this known during an inspection visit to the project site in Lagos, a joint venture between NNPC LIMITED and two other Private organizations. Century Nigeria Limited, said the initiative would increase Crude oil production by 40.000 barrels per Day (bpd), Significantly contributing to the Nation’s, economy.

In a statement by the special Assistant media and communication to Minister of State Petroleum Resources( Oil ) Nneamaka Okafor, Senator Lokpobiri expresses satisfaction with the level of work going on at the project site, reaffirmed Government’s readiness to support similar initiatives aimed at enhancing Nigeria’s Oil production Capacity.

“The FPSO Project was one of the measures the Minister’s engagement with NNPC LIMITED,in line with President Bola Ahmed Tinubu’s directive to increased crude production.”

Speaking on behalf of the private organization , a Group Chairman Mr, Ken Edward Etete confirmed that the project was on track for completion by the first quarter of next year.

“Mr, Etete provided insights on the progress and upcoming milestones for the project, noting that the FPSO Facility would not only enhance operational efficiency but also position the facility as a key contributor to Nigeria’s energy Sector”

The FPSO project demonstrated the power of partnership in the Oil and Gas Sector, promising a significant impact on Nigeria’s Economy and global energy positioning.

0 0 votes
Article Rating
Subscribe
Notify of
guest
0 Comments
Oldest
Newest Most Voted
Home
Magazines
Our Channel
About Us
Contact Us
0
Would love your thoughts, please comment.x
()
x