July 14, 2024
11 11 11 AM
SIR ABMF COMMISERATES WITH PLATEAU STATE GOVERNMENT AND PEOPLE OF THE STATE OVER THE TRAGIC INCIDENT OF SCHOOL BUILDING COLLAPSE
BREAKING: KADUNA ABDUCTED JOURNALISTS, THEIR FAMILIES REGAINED THEIR FREEDOM
SOUTH EAST HOUSE OF ASSEMBLY CAUCUS OF LP APPEALS TO PRESIDENT TINUBU TO RELEASE MAZI NNAMDI KANU FROM DETENTION   
PRESIDENT TINUBU SAYS HE RECEIVED THE NEWS OF THE COLLAPSE OF A SCHOOL BUILDING IN JOS WITH PROFOUND GRIEF   
GOVERNOR YUSUF FLAGS OFF SECOND PHASE OF EMPOWERMENT WITH N260M FOR 5,200 WOMEN 
FIRE GUTS EMIR OF KANO’S PALACEcPALACEchief or
GMSG APPEALS TO PRESIDENT TINUBU TO DIRECT THE CONTINUATION OF THE KOLMANI CRUDE OIL EXPLORATION
PRESIDENT TINUBU APPOINTS MR. SILAS AGARA AS THE NEW DIRECTOR-GENERAL OF THE NATIONAL DIRECTORATE OF EMPLOYMENT       
BIPC UNVEILS MODEL TO INTEGRATE IDPS IN TO THE SOCIETY
ACTING DIRECTOR GENERAL OF NCAA, RAISES CONCERNS ABOUT THE INSUFFICIENT AIRCRAFT CAPACITY                                                                                   

KEBBI GOVERNOR FLAGS OFF N3.8B YAURI TOWNSHIP ROADS

Share

 

KEBBI GOVERNOR FLAGS OFF N3.8B YAURI TOWNSHIP ROADS                                                                              11-11-23

By Sadiq Aminu                                                       The Kebbi State Governor, Comrade Nasir Idris, has flag-off the rehabilitation of Yauri Township roads that was awarded at the rate N3.8 billion.

Speaking while flagging-off the projects at Yauri market, the Governor promised to continue to support the people of Yauri and provide them with the dividends of democracy.

Governor Idris stated that, the contract which was awarded to the China Zhounghou Nig. Ltd. will cover the distances of 5.1kilometers.

Also speaking, the Emir of Yauri Dr. Zayyanu Abdullahi, expressed satisfaction over the development recorded so far by the present administration from inception to date.

He thanked the Governor for fulfilment of the promised made during the electioneering campaign.

Earlier, the State Commissioner for Works and Transport Engineer Abdullahi Umar Faruk,
explained that, the scope of work for the project are complete scarification of existing carriageway, construction of RC drains and culverts, provision of sub base and base courses, provision of MCI and asphalt overlay, shoulder surface dressing, and desisting of existing drains.

He assured the people of Yauri Emirate that, the construction firm is equal to the task and is ready to do quality work according to specifications.

0 0 votes
Article Rating

Leave a Reply

0 Comments
Inline Feedbacks
View all comments
Home
Our Channel
About Us
Contact Us
0
Would love your thoughts, please comment.x
()
x